Scheduling Bold Data Hub Jobs:
The Schedule page contains a list of project names and allows you to configure On Demand or Interval based schedules.

On Demand Schedule:
Data refresh can be initiated on demand by selecting the Run Now option.

Note: Run Now
option only works if we save the Project
in Load
tab.
Interval Schedule:
- To configure interval-based scheduling, click on the schedules tab and select the created pipeline and click on the schedule icon and configure it.

- Select the recurrence type, recurrence, start date, and end date in the Refresh Setting dialog box.

- The Schedule history can be checked using the history option as well as logs.
